10A NCAC 41A .0604 REPORTS
(a) The contractor shall submit periodic performance reports as specified in the contract.
(b) The contractor shall submit a final report at the close of the contract period. The report shall include an evaluation addressing progress in meeting the objectives outlined in the application.
History Note: Authority G.S. 130A‑5(3);
Eff. June 1, 1988.