15A NCAC 02T .1607       MONITORING AND REPORTING REQUIREMENTS

(a)  A monitoring system plan shall be established to assess the impact of the discharge on groundwater quality.  The monitoring plan shall:

(1)           be based on reaction rates, discharge rates, likelihood of secondary impacts, and site-specific hydrogeologic information,

(2)           track the performance of the permitted remediation system and verify that the intended remediation processes are occurring, and

(3)           include water level and flow meter measurements to ensure the system is operating properly.

(b)  All sampling results shall be reported by the permittee to the Division on a frequency determined by the reaction rates, discharge rates, likelihood of secondary impacts, and site-specific hydrogeologic information.

(c)  A report of the summarized results of related groundwater, influent, and effluent monitoring shall be submitted by the permittee to the Division annually.

 

History Note:        Authority G.S. 143-214.2(b); 143-215.1; 143-215.1A;

Eff. September 1, 2006.