section .1200 drilling units and well spacing

 

15A NCAC 05H .1201 PURPOSE AND SCOPE

The rules of this Section establish the requirements for petitioning the Commission for permission to create or modify a drilling unit. These Rules also set forth oil or gas well spacing requirements for conventional and unconventional reservoirs.

 

History Note: Authority G.S. 113-391(a)(12); 143B-293.1(b);

Eff. March 17, 2015.