15A NCAC 18C .1804       NOTICE

(a)  A local approval program shall submit notice to the Department of each approval of the construction or alteration of the distribution system of a community water system.  The notice shall consist of one copy of the application with construction plans, any revisions made to the plans and the final approval letter.

(b)  The local approval program shall provide notice to the department within 10 days of any change in staff, budget or other resources which may affect the ability to effectively carry out the plan review program.

(c)  Upon completion of the construction or alteration of the distribution system, the applicant shall submit a statement to the local approval program signed by a registered professional engineer stating that construction was completed in substantial accordance with approved plans and specifications and revised only in accordance with 15A NCAC 18C .0306. The statement shall be based upon adequate observations during and upon completion of construction by the engineer or a representative of the engineer's office supervised by the engineer.  The local approval program shall provide a copy of the statement to the Department.

 

History Note:        Authority G.S. 130A‑317; 1985 S.L., c. 697, s. 3;

Eff. January 1, 1986;

Amended Eff. December 1, 1988;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. November 23, 2015.